top of page

Mid-range (Intermediate) — $1,400–1,700/m²

Structure/Envelope: upgraded specs (hybrid steel/concrete), premium waterproofing, improved glazing (optional Low-E).
Finishes: premium porcelain/laminate, custom millwork in key areas, designer LED lighting.
MEP: zoned A/C; efficient domestic hot water; smart-home rough-ins.
Sustainability: advanced passive strategies; optional PV pre-wiring/rainwater harvesting provisions.
Architecture: greater spatial articulation and detailing; mid-to-high specifications.
QA/QC: trade-by-trade quality control; basic MEP commissioning.
Typical contingency: 12–15%.
Indicative Phase 1 fees: ~8–10% (depending on complexity).

_edited.png

Tel: (506) 8979 57 22

       (506) 7048 13 72

Email:

i

Freses, Curridabat, San José, Costa Rica

  • Gris Icono de Instagram
bottom of page